Not much was done on the house today, but we were able to enjoy a lovely sunset on this evening of the Summer Solstice.
Saturday, June 22, 2013
Friday, June 21, 2013
Stucco Brown Coat Starting
The workers started applying the stucco brown coat today, and have the East and West walls mostly finished.
Stucco Sand and Mixer
East Wall With Stucco Brown Coat
Front Door and Brown Coat
Front of House, Part with Brown Coat
Front of House, Part with Brown Coat
Family Room, and Wood Beams
View of House From the Gate
Wednesday, June 19, 2013
Interior Doors Installed
Today, the workers installed the interior doors. We chose a high quality knotty Alder wood for the doors. Knotty Alder is actually a lower-quality cut of Alder wood, but we felt it gives a more rustic and warm feel than a clear Alder. The doors, as shown here in the photos, are unfinished and unstained. Once we apply the stain, which will be fairly dark to match the cabinets, most of the knots will not be as visible. Seeing the doors installed makes it feel more and more like a real home!
Pocket Door in Master Closet
Other side of Pocket Door
Double door and Bathroom Door in Master Bedroom
Landing in Garage
Door in Guest Bathroom
Double Door and Closet Door in Den
Other Side of Double Door to Den
Door to Master Bathroom
Pantry Door with Frosted Glass
Pantry Door Closed
Sand in Driveway Ready for Stucco
Friday, June 14, 2013
Drywall Taping Plus
Work has begun taping the drywall, installing the exterior doors, putting up the wood beams in the family room, and starting the lath on the stem walls. Lots of activity this week!
Exterior Door Installation in Den
Wood Beams Being Installed in Family Room
Taping of Drywall
More Taping of Drwall in Guest Bedroom
Taping of Backer Board in Guest Shower
Taping of Kitchen, with Sunlight Streaming In
Taping of Garage
Taping in Master Bedroom
Taping in Master Bathroom and Shower
Sunset and Scaffolding Surrounding House
Sunset with Downtown in the Distance
Saturday, June 8, 2013
Drywall Hanging Complete
The workers completed hanging the drywall early Saturday. The next step is taping and mudding, which will start on Monday. They should be done by the end of next week.
Round Wall of Piano Room
Family Room
Stairway
Garage
Stairway, Looking Up
Master Bedroom
Thursday, June 6, 2013
Drywall Has Begun In Earnest
The workers started putting up the drywall this morning. By the end of the day, when I stopped by after work, there was quite a stark change to what it was just two days ago. Most of the rooms have the ceiling and upper quarter of the walls finished. A couple rooms are complete.
Den with three palettes of drywall mud in the middle
West Hallway Facing North
Kitchen
Guest Bedroom. All drywall hanging complete!
Master Bedroom, facing North
Master Bedroom, facing East
Master Bathroom
Wednesday, June 5, 2013
Final Insulation is Complete
The workers completed the final insulation stage yesterday, which included blow-in insulation in the walls, covering the polystyrene pre-insulation, and roll-in insulation bats for the ceiling and interior walls. We put the roll-in insulation in the interior walls to help block noise between rooms, especially in the bathroom walls and the laundry room walls.
Walking through the house with the insulation in really was a stark difference than from a week ago. Everything was so muffled and quiet. It made the house feel really solid and cozy.
Walking through the house with the insulation in really was a stark difference than from a week ago. Everything was so muffled and quiet. It made the house feel really solid and cozy.
Filling the rounded wall of the piano room
Guest Bedroom
Guest Bathroom
Bedroom #4
Laundry room, with insulation in wall toward bedroom #4
Kitchen
This was an interesting look: the insulation fills only the stairway in the garage wall
Master Bedroom. Part of the wall is outside, and part is an interior wall.