The workers installed all the windows on the house yesterday. Here are some photos.
Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
Thursday, May 2, 2013
Sunday, April 14, 2013
Plumbing Rough
The framing for the house has completed, so now the mechanical, plumbing and electrical are proceeding. The plumber has nearly completed all of the rough-in for the pipes throughout the house. Here are some photos of the pipes.
Pipes in the Laundry Room
Kitchen Pipes, looking up from Garage Underneath
Master Shower Valves
Pipes Over the Master Shower Connecting to Shower Heads
Hot Water Regulator for Master Bathtub
Master Bathroom Distribution Point
Main Water Supply and House Distribution
House Distribution, Coming from Basement
Subscribe to:
Posts (Atom)











