Sunday, April 28, 2013

Electrical Hookup In Progress

This week, the electrician started the hook-up of the electrical to the Utility box.  The actual electrical hookup, with live wires, is done by SRP (Salt River Project), later.  This shows the conduit connecting to the Electrical panel, going under the street to the electrical box owned by SRP.

The electrician also has pulled most of the wires to the sub-panel in the garage.  It's exciting progress!


Electrical Conduit Connecting Street to House Electrical Panel


Wires coming from Main Electrical Panel and going to House


Wires Pulled into Sub-Panel in Garage

Sunday, April 14, 2013

Plumbing Rough

The framing for the house has completed, so now the mechanical, plumbing and electrical are proceeding. The plumber has nearly completed all of the rough-in for the pipes throughout the house.  Here are some photos of the pipes.


Pipes in the Laundry Room


Kitchen Pipes, looking up from Garage Underneath


Master Shower Valves


Pipes Over the Master Shower Connecting to Shower Heads


Hot Water Regulator for Master Bathtub


Master Bathroom Distribution Point 


Main Water Supply and House Distribution


House Distribution, Coming from Basement

Thursday, April 4, 2013

Sunset From Melody

Not too much visible progress to report on the house. The framers are still finishing up.  We met with the Electrician and Light Lady today to verify the light placement on the plans.  After finalizing with them, we were treated to this nice sunset.