Today (Friday, March 8, 2013) was cold and rainy, so the framers took the day off. To help you all from getting bored, here are a few videos of the workers pouring the slab and garage floor. They poured the slab on February 14, 2013 (Valentine's day).
Part of the lot prep is to excavate large rocks and dig out the areas where the footer walls will be. The Wall Company used a large excavator to do most of the job. Here it's parked on top of a large pile of rocks. Eventually, to the left, will be the footer walls, and further to the left will be the driveway.